Production Deployment Checklist
Use this checklist to track deployment readiness
Pre-Deployment Setup
- • SSH access and Coolify dashboard access
- • Database URL ready
- • Google & Facebook OAuth apps configured
- • Stripe account and webhook configured
- • Domains and SSL verified
Environment Variables
- • OIDC keys generated and stored securely
- • AUTH_SECRET and TYPEBOT secrets generated
- • OAuth client IDs and secrets configured
- • Stripe keys and price IDs set
- • DATABASE_URL verified
Database Setup
- • Prisma migrations applied
- • Tables verified
- • Stripe plans seeded
Typebot Configuration
- • OIDC provider enabled
- • Public auth disabled (Google/Facebook/Email)
- • Subscription checks enforced
- • Engine restarted
Testing & Launch
- • OIDC endpoints verified
- • Subscription flow tested
- • Webhook events validated
- • Health checks passing